Business

Korea Aviation Technologies

Thrust Test Rig

Introduction of 100 kW ~ 300 kW Thrust Test Rig (UAM)
  • 1
    Precise measurement of thrust for manned/unmanned UAM's EPS
  • 2
    Able to manufacture any configuration (Single, Dual, etc.) of Pod
  • 3
    Provide consulting and data on the combination of propeller, motor, inverter, and the battery system
  • 3
    Able to design and apply auxillary subsystems such as propeller governor, tilting system, etc.

Specification and Performance

Measurement Type Measurement Range
Thrust Test Rig #1 Thrust Test Rig #2 Thrust Test Rig #3
Thrust ~ 10,000 N ~ 12,500 N ~ 10,000 N
Torque ~ 200 Nm ~ 1,000 Nm ~ 1,000 Nm
Speed ~ 10,000 RPM ~ 10,000 RPM ~ 10,000 RPM
Voltage ~ 500 Vdc ~ 500 Vdc ~ 1,000 Vdc
Current ~ 300 Adc ~ 300 Adc ~ 500 Adc
Vibration ~ 10 G ~ 10 G ~ 10 G
Test Rig Type Single Single Dual
Max Prop Dia ~ 1.6m ~ 1.6m ~ 3.0m
Features

Tilt (0 ~ 90 degree)
Blade Pitch Control
Structure limit : 3ton

Motors Used

Measurement Type BEYOND MOTOR (Double/Triple Motor Mounting Available)
AXM2 AXM3 AXM4
Ppeak / Pcont 130kW / 75kW 220kW / 130kW 430kW / 230kW
Tpeak / Tcont 180Nm / 125Nm 525Nm / 310Nm 950Nm / 600Nm
Mass 14.5kg 27kg 48kg
Features
Provide various EPS performance verification and precise control data to meet customer needs, including domestic/foreign commercial motors and developing motors, inverters, propellers, etc

video